Build a planning material schedule from project geometry and a stale Q1 2025 rate snapshot. Replace every rate and quantity with current supplier and quantity-surveyor evidence.
Enter project geometry and fixture counts to create an indicative material schedule. Embedded rates are an unverified Q1 2025 snapshot, not current market prices or a measured BOQ.
Planning estimate only. A qualified quantity surveyor must measure and price the project before procurement or contract use.
Enter your measurements and quantities in the fields above. The Bill of Quantities Generator then gives you a costed material and labour estimate you can use straight away.
It is a low-confidence planning schedule using an unverified Q1 2025 rate snapshot. A quantity surveyor must verify measurements, specifications, current prices and tax.
It is free and currently provides embedded rate snapshots for 15 countries. Replace every snapshot with current local evidence.
Construction budgets fail when material pricing, labour, contingency, and scope changes are separated. A BOQ-style tool works best when cost research is translated into line items early.
Translate material and scope assumptions into a more structured bill of quantities.