Shift / Production Data
The full shift or measurement window
Breakdowns, material shortages, operator absence
Time excluded from planned production by your measurement policy
Verified design/nameplate or validated best-repeatable rate
Use contribution, not selling price, for the opportunity scenario
OEE Score
Recorded-period result
Measured loss inputs
Lost Opportunity
Good Units Produced
—
Max Possible Units (100% OEE)
—
Units Lost
—
Contribution opportunity (scenario)
—