Manufacturing

OEE Calculator

Calculate availability, performance, quality and OEE from one recorded production period. No loss split or benchmark is invented from the totals.

Shift / Production Data

The full shift or measurement window
Breakdowns, material shortages, operator absence
Time excluded from planned production by your measurement policy
Verified design/nameplate or validated best-repeatable rate
Use contribution, not selling price, for the opportunity scenario

OEE Score
Recorded-period result

Measured loss inputs

Lost Opportunity

Good Units Produced
Max Possible Units (100% OEE)
Units Lost
Contribution opportunity (scenario)

Review priorities from measured dimensions