Shift / Production Data
e.g. 8-hr shift = 480 min
Breakdowns, material shortages, operator absence
Changeovers, preventive maintenance, breaks
Theoretical maximum speed
Optional — to calculate lost revenue
OEE Score
Six Big Losses Analysis
Lost Opportunity
Good Units Produced
—
Max Possible Units (100% OEE)
—
Units Lost
—
Revenue Lost (if priced)
—